A complete solution that begins with the testing and commissioning plan and ends with the successful start up load testing of equipment and system. Factory Acceptance Testing (FAT), Site Acceptance Testing (SAT), Phased commissioning or loads testing. We use our extensive library of Inspection and Test Plans, Procedures, Test Verification documents.
https://pesvs.com.au/the-benefits-of-conducting-site-acceptance-testing/